Shown in the picture is a 48 hour onsite test to ensure proper functionality and reliability.
Testing begins at the DSi offices with Simulations designed to verify hardware and software.
Factory Acceptance Testing (FAT) tests the control system before it is shipped using simulations and a FAT acceptance test procedure and checklist.
Site Acceptance Testing (SAT) tests the control system onsite with all structural, mechanical, and facilities systems running and is the final test required for customer final approval.